You are here: Home/ Events / 1st THURSDAY — Broomfield, Colorado US287/Midway by Starbucks — GEC Banner Preaching and Street Ministry. (RUNNING WAY BEHIND SCHEDULE. THANKS.) (NOT PHYSICALLY ABLE. I TRIED. I’M WORN OUT, NEED TO REST THIS OLD BODY. THANK YOU.)
1st THURSDAY — Broomfield, Colorado US287/Midway by Starbucks — GEC Banner Preaching and Street Ministry. (RUNNING WAY BEHIND SCHEDULE. THANKS.) (NOT PHYSICALLY ABLE. I TRIED. I'M WORN OUT, NEED TO REST THIS OLD BODY. THANK YOU.)
1st THURSDAY — Broomfield, Colorado US287/Midway by Starbucks — GEC Banner Preaching and Street Ministry. (RUNNING WAY BEHIND SCHEDULE. THANKS.) (NOT PHYSICALLY ABLE. I TRIED. I'M WORN OUT, NEED TO REST THIS OLD BODY. THANK YOU.)